Intelligent fan assembly line project

Intelligent fan assembly line project

photobank

Main function of production line: assembly of finished fan

Customer products are measured by a single unit, assembly quality and consistency requirements are high, repetitive work of action rules, has a reasonable demand for automation.

Product process

1.Manual fill the work feed bin

2.1#2#3# Assemble and fix the guide plate and front mounting plate at the station

3.5#6#7# Assemble and fix the motor and impeller at the station

4.4# Move the front mounting plate assembly and impeller assembly to the positioning conveyor line

5.8#9# Assemble and fix the rear mounting plate at the station

6.10#11# Station assembly and fixed machine

7.12# The station will transport the finished fan to the dynamic balancing line.

8.13# multi-station fully automated balancing machine

9.14# work station palletizing

22
33

1#2#3

Assemble and fix the guide plate and front mounting plate at the station

Main equipment: HY1010A-143/2 set, positioning feed bin 2 set, safe rail 1 set. Positioning conveyor line 1 set, and Auxiliary assembly mechanism /3 sets.

44

5#6#7#

 Assemble and fix the motor and impeller at the station

Main equipment: HY1010A-143 1 set, HY 1020A-168 2 set, positioning conveyor 1 set, Auxiliary assembly mechanism 3 sets.

55

4#

Work position handling

Main equipment:HY1020B-180 1 set,Positioning conveying line /1 set, auxiliary handling mechanism /1 set

66

8#9# positioning assembly and fix it and install board

Main equipment: HY1010A-143/1 set, HY1020A-168/1 set, positioning silo /1 set, safety fence /1 set, positioning conveyor line /1 set, auxiliary assembly mechanism /2 sets, etc.

77

10#11# Assemble and fix the whole machine at the station 

Main equipment: HY1010A-143/1 set, HY1020A-168/1 set, positioning conveyor line /1 set, safety fence /1 set, auxiliary assembly mechanism /2 sets, etc.

88

12 # station handling:

the main equipment: HY1020B - 180/1 set, positioning conveyor line / 1 set, 1 set of auxiliary transportation organization/etc.

99

13 # location dynamic balance:

the main equipment: HY1020A - 168/2 sets, auxiliary transport agency / 2 sets, positioning conveyor line / 2 set, dynamic balance plane / 2 set, security fence / 2 sets, etc.

应该

14 # location pallet:

the main equipment: HY1020B - 180/1 set of library, tray / 2 set, auxiliary pallet organization / 1 set, etc